Dominator Peak Pro - PICV / Strainer Drain / FMD - Z9601PF

  • Image of Dominator Peak Pro - PICV / Strainer Drain / FMD - Z9601PF
  • Image of Dominator Peak Pro - PICV / Strainer Drain / FMD - Z9601PF
  • Image of Dominator Peak Pro - PICV / Strainer Drain / FMD - Z9601PF
  • Image of Dominator Peak Pro - PICV / Strainer Drain / FMD - Z9601PF
  • Image of Dominator Peak Pro - PICV / Strainer Drain / FMD - Z9601PF
  • Image of Dominator Peak Pro - PICV / Strainer Drain / FMD - Z9601PF
  • Views 1.6k
  • Comments 0
  • Rating- / 5
    Rate this product
    1/5 Rating1/5 Rating2/5 Rating2/5 Rating3/5 Rating3/5 Rating4/5 Rating4/5 Rating5/5 Rating5/5 Rating

EN ISO 23386

Compliant

BS1192:4

Compliant

BSB

Compliant

Object Data

1 Revision

Last Updated

22/05/2019

Available for:
  • Logo: Autodesk Revit

Compact design, with flow and return legs at equal lengths, for simple direct mounting onto terminal unit. Fitted with Peak Pro with a wide range of settable flows to suit all applications. Includes Venturi metering station for improved accuracy and pressure drop recovery. All valves are subject to both a pressure test, in accordance with BS EN 12266-1, as well as a flow limitation test, in accordance to BSRIA BTS1. This provides reassurance of performance and accuracy within each valve. Bypass unit with integrated 3-way isolation valves. Flushing valves on flow and return - in accordance with BSRIA BG29.Integrated dial allowing for calibrated setting of the PICV with integrated test points allowing for ΔP verification.

Read more

Accompanying literature

Embed Product

To embed this product into any website simply copy and paste the code below.

Community comments

You might also like

CloseClose