Metsä Wood provided the components for an easily movable office building

The Building D(emountable) is a four-storey office building with the ability to be moved easily moved to a different location.

Dutch architects cepezed specified products from bimstore manufacturers Metsä Wood for the project, which combines a steel structure with wooden elements and a glass façade.

Using Kerto® LVL (laminated veneer lumber) elements made the project more sustainable, and the lightweight elements enabled rapid installation.

“I was impressed by the speed in assembly,” says cepezed founder and architect Jan Pesman.

“The whole stability structure was put together in only three weeks. Kerto LVL elements were practical and really suitable for prefabricated, industrial construction methods.

“We are definitely looking forward using Kerto LVL elements again.”

We are definitely looking forward using Kerto LVL elements again

Using Metsä’s wooden components also allows for the whole process to be reversed, so the structure can be easily dismantled in the future.

“You can also dismantle the building and rebuild it somewhere else. If needed or wanted, you can just move this building wherever you want,” says structural engineer Elise van Westenbrugge-Bilardie from IMd consultative engineers.

Metsä Wood are currently running a Hybrid City Challenge, with a top prize of €10,000. The competition aims to encourage the exploration of new methods conducive efficient and sustainable building. Using Kerto LVL as the main material, entrants must design a solution fit for hybrid construction. 

Head to Metsä Wood's website for more information and find their products on bimstore. 

Community comments

Latest News

STELRAD LAUNCHES FIRST EVER ‘GREEN STEEL’ RADIATOR SERIES

Posted 01.03.2024

Leading radiator manufacturer Stelrad Radiators is going green with another UK powerhouse Tata Steel to offer the first 90% green steel radiator range. Tata Steel is supplying UK made 90% Carbon Lite steel exclusively to Stelrad within the radiator market, so that Stelrad customers can choose a Green Compact radiator range that contributes directly to a reduction in atmospheric CO₂ today and accelerates decarbonisation in the future.

Introduction to BIM Webinar Series

Posted 28.02.2024

bimstore Introduction to BIM Webinar Series

In this brand new webinar series, hear from a range of industry pioneers how Building Information Modeling (BIM) & Revit content is going to transform the Australian built environment. It features practical tips and real-life experience from knowledgeable experts.

Revolutionising Moisture Management with Siderise's CT Cavity Tray: A Case Study on Anchorage Gateway

Posted 19.02.2024

Anchorage Gateway used Siderise's CT Cavity Tray for moisture management, providing significant labour and time-saving benefits.

CloseClose