Keep up to date with everything Bimstore, including news, case studies, videos and webinars.

Hawthorn Primary School is a co-educational primary academy located in Cantley, Doncaster, providing education for children from early years through Year 6. The site comprises multiple buildings of differing ages and construction types, which together accommodate classrooms, shared learning spaces and support facilities.

The video follows the step-by-step assembly of three 80kW Imax Xtra 2 floor standing commercial condensing boilers in real time, demonstrating a complete build from first part to final connection, ultimately achieving up to 840kW of heating capacity in under 90 minutes - proving powerful output doesn’t have to mean long build times.
In this video, Ideal Heating cascade three Evomax 2 boilers on a low height frame and header kit, together with a choice of hydraulic separation options to protect your boiler including plate heat exchangers, low loss headers and magnetic low loss headers all installed with pre-formed insulation kit - saving hours of valuable time.

Founded in 1921 and situated on a private peninsula at the entrance to Chichester Harbour, which enjoys some of Britain’s best sailing waters, Hayling Island Sailing Club has the rare privilege of being one of only four Royal Yachting Association coastal Centres of Excellence and is one of the leading sailing clubs in the UK.

This refurbishment project upgraded two listed buildings in Cambridge into high-quality student accommodation, replacing the existing boiler system with Ideal Heating's high-efficiency air source heat pumps. The result is a low-carbon, energy-efficient heating solution that preserves the buildings’ historic character while delivering modern comfort and sustainability.

Ideal Heating Commercial has provided four Evomax 2 boilers for the new Ash View Extra Care development in Huddersfield, supplying heating to 50 apartments through an efficient central system. Read more about their case study.

Read about the installation of the Imax Xtra boiler - available as a download here on bimstore

Opened in 1871 as Hull’s Dock Offices, this Grade 2* listed building became Hull Maritime Museum in 1975, highlighting Hull’s role as a modern maritime city. Two Imax Xtra 2 240kW boilers installed in cascade on a prefabricated header kit now provide an efficient solution for the museum.

Four Ideal Heating Commercial Evomod 1000kW output boilers have been installed at Beetham Tower in Manchester, with Plate Heat Exchangers to achieve the appropriate pressure on the output in order to pump the hot water across the entire building. With restricted access to the plant room and space limitations within it, the small size and modular nature of the Evomod boilers made locating and installation easier than expected.