Kitchen and bathroom manufacturer, Moores Furniture Group, sat down with us to have a chat about all things BIM.

For a company like Moores, being able to keep up with demand but allow versatility to shine through in their ever useful range of products is key to their success using BIM.

At Moores we have over 8000 different components.

"The challenge that we had with supplying BIM format is that kitchens are very complicated. It's multi-configured components into one room and theyre all used in to lots of different ways.

There's a level of complexity that's difficult to communicate, but by using BIM we can tackle those complexities."

Whether it's an architect designing an apartment block, with the need to move kitchens around from apartment to apartment or if it's an interior designer, looking for a one off tailor made kitchen, Moores have you covered.

With over 3000 kitchens being manufactured every week at their plant in Wetherby, they're a brand that won't let you down. 

Community comments

Latest Case Studies

Ideal Heating: Reducing carbon emissions with ECOMOD commercial heat pumps

Posted 30.08.2023

Play VideoPlay Video

Ysgol Tir Morfa Community School in North Wales is an additional learning needs school for children aged from 3 to 18. The school is split across three areas, with the newest part now being heated by two Ideal Heating 32kW ECOMOD monobloc air source commercial heat pumps. Find out more in this informative case study brought to you by Ideal Heating.

Stratton Mk3 wall-hung boiler helps charity lower operational costs

Posted 01.08.2023

Since 1926, the Hull & East Yorkshire Centre for the Deaf has been helping the local deaf community with support and social events. As their heating system was nearing the end of its life, Hamworthy Heating have provided them with an upgrade to the new Stratton Mk3.

Ideal Heating: Next Retail

Posted 23.07.2023

This case study explores how Next Retail call centre in Leicester, which is also home to offices and a staff shop, has benefitted from a new Imax Xtra 2 200kW condensing boiler from Ideal Heating commercial products. The Imax Xtra 2 replaces the existing boiler in the building – its predecessor, the IMAX plus III – which had come to the end of its working life.