BIM helps to create new Colombian cancer facility

Cancer has long been one of the biggest issues facing humanity, but in Colombia the illness has been especially widespread with very few treatment options available.

Set to open in 2021, and described as “a social donation to the country and to the region,” Bogotá’s Luis Carlos Sarmiento Angulo Cancer Treatment and Research Centre (CTIC) will play a big part in tackling the country’s lack of facilities.

Around 63,000 Colombians are diagnosed with cancer every year - but despite Colombia having 1780 different cancer-care providers, only 25 of them can offer chemotherapy, radiotherapy and surgery all under one roof.

This means that many Colombians must travel as far as the United States to be treated for certain types of cancer.

The CTIC has been designed by construction company Construcciones Planificadas, using the BIM process in order to make the plans as precise as possible.

“We have more than 30 different specialties that need to be integrated, it would be impossible to co-ordinate such a large, international team using a traditional 2D methodology… it guarantees that you have fewer faults in the final product,” said design manager Mauricio Patiño.

“It would be impossible to co-ordinate such a large, international team using a traditional 2D methodology… it guarantees that you have fewer faults in the final product”

The building will provide 128 hospital rooms, 30 intensive-care beds, eight radiotherapy bunkers, six operating rooms, 60 chemotherapy chairs, a hematology and bone marrow–transplant clinic, and a 10,000-square-meter (107,639-square-foot) research building.

As well as having a positive impact on cancer patients, the building will be environmentally friendly too. Boasting dedicated parking spaces for low-emission vehicles and carpooling; bicycle racks; native-species landscaping with an efficient drip-irrigation system; energy-efficient medical equipment; an on-site treatment plant for grey water and rainwater, which will be recycled for toilets and urinals; a solar water-heating system; low-VOC paints, sealants, and adhesives; a backup electricity system that uses a flywheel instead of batteries; and a modular facade with alternating blank and glazed zones for optimal energy performance.

The use of BIM in the design process will help to reduce unnecessary waste and the risk of changes needing to be made once construction has started, making for a much more productive project. This dedication to sustainability and preventing waste also means that the money saved through the centre reducing their costs could lead to a more significant level of investment, resulting in better quality care for their patients.

Community comments

Latest News

Sotech and Siderise at the Zak World of Façades Event

Posted 25.04.2024

Zak World of Facades

Two leading UK manufacturers in the façade & fenestration industry were partners of the flagship Zak World of Façades Event in Dubai, UAE. Zak Exhibitions & Conferences are pioneers in promoting technologies in the domain of glass processing, façade & fenestration through exhibitions and conferences.

Manufacturers vs Single-Use Plastic

Posted 22.04.2024

Discover how leading manufacturers in the construction industry are taking steps to reduce single-use plastic waste and incorporate recycled plastics into their manufacturing and distribution processes. In this Earth Day article, you can learn more about the innovative approaches of leading manufacturers on bimstore and their actions against single-use plastic.

Webinar Replay: Practical Tips for Getting Started with BIM

Posted 17.04.2024

Introduction to BIM Webinar: Practical Tips for Getting Started with BIM
Play VideoPlay Video

This webinar series was curated especially for an audience concerned with the Australian built environment. A range of industry pioneers revealed how BIM & Revit content is going to transform the world of construction there. It featured practical tips and real-life experience from knowledgeable experts. In the third episode of our series, hear from Ryan Wigham, Associate Director of bimstore, with 23 years experience in the construction environment. He will take you through practical tips for getting started with Revit content and the relationship with Building Information Modeling (BIM) objects.

CloseClose