Kawneer systems seal the private rental deal at Erie Basin

Architectural glazing systems by leading UK manufacturer Kawneer were specified for their “robustness and quality” for two linked 16-storey apartment blocks on the last plot to be developed in one of Britain’s fastest-growing property hot spots.

Kawneer’s AA®100 curtain walling features as strip curtain wall to copper-coloured rainscreen areas of the £37 million BTR (Build To Rent) towers at Erie Basin in Salford Quays, Manchester, a stone’s throw from MediaCityUK.

In addition, the manufacturer’s AA®110 curtain walling features on link bridges and as floor-to-ceiling screens facing the water. While the AA®100 system uses 50mm sightlines, the AA®110 system uses 65mm but both in this case were zone-drained. They are complemented by AA®541 open-out casement window inserts and AA®720 ultra thermally-efficient entrance doors.

The Kawneer systems were installed over eight months by a team of up to 35 from approved specialist sub-contractor FK Group for main contractor GRAHAM and client Glenbrook, the privately-owned property development and investment company, who acquired the site from the Peel Group.

We specify Kawneer systems because they are robust, quality products

The prominent dockside development is GRAHAM’s second project with Glenbrook, with work also underway on another £27 million BTR project in Ellesmere Street, Castlefield, Manchester, which also features Kawneer systems.

At the 220,000ft2 Erie Basin development, which features one, two and three-bedroomed apartments with tenant lounge, gym, private elevated garden terrace and undercroft car parking, the Kawneer aluminium systems were specified by regular Kawneer users Sheppard Robson Architects.

A spokesperson said: “We specify Kawneer systems because they are robust, quality products. The curtain wall was integral to the visual impact of the picture-frame gable ends to the north and south elevations. The strip curtain wall glazing to east and west elevations alternates in plan at every third floor to tie in to the rhythm of the dynamic folded aluminium rainscreen façade”

“The Kawneer materials interfaced well with the other materials used on the project from a performance perspective (air tightness etc) and the client is very pleased.”        

GRAHAM’s contract director on the project, Graeme Moffat, said: “Despite some demanding ground conditions, we have been able to help Glenbrook realise the Erie Basin project through an innovative foundation and concrete frame solution.

The Kawneer materials interfaced well with the other materials used on the project

“This is our third BTR scheme in the Greater Manchester area and we see residential continuing as a key sector for us, building on our portfolio of experience with large-scale apartment, student accommodation and hotel projects across the UK.”

The project was forward-funded by Moorfield which has also backed two other Glenbrook projects in the North West.

Glenbrook projects director Stuart McCrone said: “We have brought an exceptional product to an already high-quality destination that is improving day by day. The performance of the project team has been exemplary and now complete, Erie Basin raises the bar for BTR accommodation in Salford Quays.”

Find Kawneer's products on bimstore. 

Community comments

Latest News

Webinar Replay: Practical Tips for Getting Started with BIM

Posted 17.04.2024

Introduction to BIM Webinar: Practical Tips for Getting Started with BIM
Play VideoPlay Video

This webinar series was curated especially for an audience concerned with the Australian built environment. A range of industry pioneers revealed how BIM & Revit content is going to transform the world of construction there. It featured practical tips and real-life experience from knowledgeable experts. In the third episode of our series, hear from Ryan Wigham, Associate Director of bimstore, with 23 years experience in the construction environment. He will take you through practical tips for getting started with Revit content and the relationship with Building Information Modeling (BIM) objects.

BIMCRUNCH: latest issue now available!

Posted 17.04.2024

The latest edition of BIMCRUNCH is now available, featuring a range of captivating articles and insights. This edition includes an exclusive introductory piece on new office furniture manufacturer Gresham, updates on the expansion of bimstore in Australia, and how manufacturers are tackling single-use plastic in the industry. Additionally, there are updates and case studies from Siderise, EGGER, Energystore, and Stelrad. The spotlighted collection for this edition is the Bathroom Collection, featuring products from VADO, GROHE, and Altro Limited. Be sure not to miss out on this exciting edition of BIMCRUNCH!

Energystore: Re-Thinking Construction with Free-flowing Insulation

Posted 05.04.2024

Construction technology is evolving at an unprecedented pace, and building professionals are increasingly looking for innovative ways to improve their projects' thermal performance and efficiency. Find out more about Energystore's free-flowing insulation in this article.

CloseClose